Complete welding qualification documentation per ASME Section IX QW-200/300/400. WPS, PQR, mechanical test results (tensile, bend, hardness, Charpy), welder log — single 4-page PDF accepted by L&T, BHEL, IOCL, ONGC, NTPC.

📋 WPS per ASME IX 🔬 PQR with test results ⚗️ Lab Tests tensile/bend/hardness 📊 Pass-by-pass heat input 👷 Welder log qualification

📋 WPS Header QW-200.1

🔧 Welding Process QW-401

🔩 Base Metals QW-403

🧪 Filler Metals QW-404 Auto-suggested

📐 Joint Design QW-402

⚡ Welding Parameters QW-409 Auto-filled

🌡️ Gas, Preheat & PWHT QW-406/407/408

🔬 PQR Header QW-200.2

Procedure Qualification Record — the test that PROVES this WPS produces sound welds. Tested on actual coupon, results documented below.

🏭 Test Laboratory Required

📋 Welding Process Used As Per WPS

Actual values used during test welding (must be within WPS range):

⚗️ Mechanical Test Results QW-150

Lab test results that prove weld integrity. All values entered will appear in PQR PDF.

📏 Tensile Test PASS

QW-152: Reduced section tensile, failure must occur in base metal at ≥ specified UTS

SpecimenWidth (mm)Thickness (mm)Area (mm²)Max Load (kN)UTS (MPa)Failure Location
TS-1
TS-2

✓ Both specimens exceed minimum 515 MPa (SS316L). Failures in base metal indicates weld is stronger than base material.

🌀 Bend Test PASS

QW-160: 2 face bend + 2 root bend (or 4 side bend if T ≥ 10mm), 180° around mandrel

🔨 Hardness Survey PASS

Vickers HV10. Max 350 HV for SS, 320 HV for sour service per NACE MR0175

🔋 Charpy V-Notch Impact PASS

3 specimens each at weld metal & HAZ. Min energy depends on grade & temp.

LocationTemp (°C)Energy 1 (J)Energy 2 (J)Energy 3 (J)Average (J)Min Req (J)
Weld Metal
HAZ

🔍 Macro / Micro Examination PASS

🧬 Additional Tests (if required)

📊 Pass-by-Pass Welding Sequence QW-409 detail

Each weld pass with current, voltage, speed, and calculated heat input. This is what auditors check.

PassProcessFiller SizeCurrent (A)Voltage (V)Speed (mm/min)Heat Input (kJ/mm)
Root
Hot Pass
Fill 1
Fill 2
Cap

Heat Input formula: HI = (Volts × Amps × 60) / (Speed × 1000) kJ/mm. Multi-pass keeps each pass below interpass limit.

🎯 Step-by-Step Welding Procedure

1Material Preparation: Clean joint surface 25mm each side with stainless steel brush, acetone wipe. Remove all oil, grease, mill scale.
2Joint Fit-up: Set root gap as specified. Tack weld at 3, 6, 9, 12 o'clock positions. Tack length max 25mm, height max 3mm.
3Backing Gas: Purge backing gas (Argon) until O₂ < 50 ppm before starting root pass.
4Root Pass (GTAW): Use 2.4mm filler. Maintain stable arc, no oxidation. Inspect each tack point fusion.
5Inter-pass Cleaning: Wire brush + grind any defects. Check temperature < 150°C before next pass.
6Fill Passes: Stringer or weave as per WPS. Stay within heat input range. NO weaving for duplex/Inconel.
7Cap Pass: Slightly wider, smooth finish. No undercut > 0.5mm.
8Visual Inspection: Per AWS D1.1 / ASME B31.3. No cracks, undercuts, porosity exceeding limits.
9NDT Tests: Per code — typically 100% RT or UT for pressure piping. PT for surface check.
10PWHT (if applicable): Slow heating 50-100°C/hr, soak time 1hr per 25mm, controlled cooling.

👷 Welder Qualification QW-300

📝 Welder Performance Test Results

🏢 Manufacturer Information

Free: 1 WPS+PQR PDF today

Generate Documents

💎 Free Plan

1 WPS+PQR per day
SteelDesk watermark
4-page complete PDF

🚀 Pro — ₹1,999/mo